paver operating normally until there is no more mix in the hopper or in the auger chamber. At the point where the mix becomes nonuniform across the width of the lane being paved, a taper is constructed with the leftover mix. No vertical face is formed, and the mix is merely tapered from the proper layer thickness to the level of the adja cent existing pavement. Any mix not needed .